What’s Inside the eBook
Considering the lost revenue, repairs, wasted labor expenses, and other costs involved, unplanned downtime can cost operators upwards of $500,000 per hour, according to some estimates.
If you fail to replace the barrel liner on time, for example, abrasive oilseeds could wear completely through the liner and start eroding the inside of the actual barrel—which is a significant expense and requires lengthy downtime to install.
An effective preventative maintenance program can keep your extruder and other Anderson equipment operating at peak performance with less unscheduled downtime and fewer costly repairs—so you can keep oil and profits flowing without interruption.